Officials from Stellantis and LG Energy Solution are poring over an enhanced subsidy deal from Ottawa designed to save a 2,500-worker Windsor electric-vehicle factory from being moved to the U.S.
in Stellantis subsidies.
“We put more money on the table. We’re in for one-third of the cost. We’ve stepped up in a huge, huge way,” Ford said last week in Kingsville near Windsor.halted construction of its joint venture with Korea-based LGES on May 15. “This is the federal government’s deal and we’re there to support them. We’re putting more money up and I think we’re about that close from getting it done,” noted Ford, holding up his index finger and thumb.Champagne told the Star last week that he was “at the forefront of” a verbal presentation to the Stellantis board in Paris on May 31.
Ford confirmed that he was on the phone with Freeland and other federal and provincial officials until 2 a.m. Wednesday — hours before Champagne’s presentation to the Stellantis board.we’d be up at talking to each other,” he said.
France Dernières Nouvelles, France Actualités
Similar News:Vous pouvez également lire des articles d'actualité similaires à celui-ci que nous avons collectés auprès d'autres sources d'information.
Motor Mouth: Why Trudeau may be balking at Stellantis’ demandsICYMI: Why Trudeau may be balking at Stellantis’ demands — via drivingdotca ElectricVehicles
Lire la suite »
Motor Mouth: Why Trudeau may be balking at Stellantis’ demandsICYMI: Why Trudeau may be balking at Stellantis’ demands — via drivingdotca ElectricVehicles
Lire la suite »
Motor Mouth: Why Trudeau may be balking at Stellantis’ demandsICYMI: Why Trudeau may be balking at Stellantis’ demands — via drivingdotca ElectricVehicles
Lire la suite »
Motor Mouth: Why Trudeau may be balking at Stellantis’ demandsICYMI: Why Trudeau may be balking at Stellantis’ demands — via drivingdotca ElectricVehicles
Lire la suite »
Quebec battery processing plant eyed by Stellantis, Mercedes-Benz joint ventureAutomotive Cells Co. (ACC), a battery cell manufacturing joint venture between Stellantis, Mercedes-Benz and France-based energy giant TotalEnergies, is eying Quebec as the possible location for a new battery processing plant, according to lobbyist filings with the Canadian government.
Lire la suite »
‘Under control’: Wildfire in the Halifax area 100% contained, officials say | Globalnews.caThe province announced on Sunday that the fire in Tantallon, which destroyed about 200 buildings and caused thousands to evacuate, is now under control.
Lire la suite »